{"id":1866,"date":"2026-06-10T13:29:39","date_gmt":"2026-06-10T13:29:39","guid":{"rendered":"https:\/\/trustedainews.com\/?p=1866"},"modified":"2026-06-10T13:29:39","modified_gmt":"2026-06-10T13:29:39","slug":"ignis-to-build-dayones-300mw-data-center-in-aragon-spain","status":"publish","type":"post","link":"https:\/\/trustedainews.com\/?p=1866","title":{"rendered":"Ignis to build DayOne&#8217;s 300MW data center in Aragon, Spain"},"content":{"rendered":"<p>DayOne has revealed details of its first data center in Spain, a 300MW campus in the Aragon region.. Renewable energy firm Ignis is developing the data center in the municipality of Escatr\u00f3n, near Zaragoza.. The project, which will cost more than \u20ac3 billion ($3.47bn), aims to become one of the largest AI campuses in Southern Europe. It will be operated by DayOne and located on a plot of around 900 hectares.. Aragon is an up-and-coming region for data centers \u2013 Getty Images. The development will be geared towards hosting high-density AI and high-performance computing workloads, and designed to scale to 300MW, though the size of the first phase hasn\u2019t been revealed. A timeline for the development has also yet to be announced.. Ignis has experience as an energy developer, and the Aragon region is fast becoming a data center hub thanks to a combination of available land, access to renewable energy, electrical capacity, and plentiful fiber connections.. The announcement reinforces the region&#8217;s transformation into a hub for artificial intelligence payloads, a segment that demands increasingly larger campuses with high energy and cooling requirements.. DayOne, which spun out of Chinese data center firm GDS in 2025, announced Series C funding of $4.5 billion last week. At the time, it noted Spain as a key market for its future growth but did not identify any sites it intended to develop.. This piece was automatically translated from DCD&#8217;s Spanish site and edited by a member of DCD&#8217;s editorial staff.. 02 Jun 2026<\/p>\n<p>\u00a0<\/p>","protected":false},"excerpt":{"rendered":"<p>DayOne has revealed details of its first data center in Spain, a 300MW campus in the Aragon region.. Renewable energy&hellip;<\/p>\n","protected":false},"author":2,"featured_media":1717,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[],"class_list":["post-1866","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-data-center"],"_links":{"self":[{"href":"https:\/\/trustedainews.com\/index.php?rest_route=\/wp\/v2\/posts\/1866","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trustedainews.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/trustedainews.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/trustedainews.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/trustedainews.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1866"}],"version-history":[{"count":0,"href":"https:\/\/trustedainews.com\/index.php?rest_route=\/wp\/v2\/posts\/1866\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trustedainews.com\/index.php?rest_route=\/wp\/v2\/media\/1717"}],"wp:attachment":[{"href":"https:\/\/trustedainews.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1866"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/trustedainews.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1866"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/trustedainews.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1866"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}