{"id":2237,"date":"2026-06-19T16:20:28","date_gmt":"2026-06-19T16:20:28","guid":{"rendered":"https:\/\/trustedainews.com\/?p=2237"},"modified":"2026-06-19T16:20:28","modified_gmt":"2026-06-19T16:20:28","slug":"plans-filed-for-three-building-data-center-campus-in-northumberland-uk","status":"publish","type":"post","link":"https:\/\/trustedainews.com\/?p=2237","title":{"rendered":"Plans filed for three-building data center campus in Northumberland, UK"},"content":{"rendered":"<div class=\"w-block-text block-text\">\n<p data-block-key=\"s0o7h\">Plans have been filed to develop a data center in the northeast of England, close to QTS\u2019 planned development.<\/p>\n<p data-block-key=\"b7n8n\">As reported by the <a href=\"https:\/\/www.northumberlandgazette.co.uk\/news\/politics\/council\/plans-lodged-for-new-data-centre-in-northumberland-8749092\">Northumberland Gazette<\/a>, and <a href=\"https:\/\/www.fdiintelligence.com\/content\/fe2a4057-848c-4cdc-8d1a-4556c436916b\">FDI Intelligence<\/a>, Wansbeck Regeneration Ltd this month <a href=\"https:\/\/publicaccess.northumberland.gov.uk\/online-applications\/applicationDetails.do?keyVal=TGQCQFQSMQD00&amp;activeTab=summary\">filed<\/a> for planning permission with Northumberland County Council to develop a data center campus.<\/p>\n<\/div>\n<div class=\"w-block-image block-image\">\n<div class=\"sf-image--right js-lightbox-item\">\n<p>                <img loading=\"lazy\" decoding=\"async\" alt=\"sleekburn dc campus\" height=\"271\" src=\"https:\/\/media.datacenterdynamics.com\/media\/images\/sleekburn_dc_campus.width-358.png\" width=\"358\" \/><\/p>\n<div class=\"sf-image__meta js-lightbox-caption\">\n                \u2013 Wansbeck Regeneration\n        <\/div>\n<\/div>\n<\/div>\n<div class=\"w-block-text block-text\">\n<p data-block-key=\"1lgnr\">The company is seeking to develop on 28 hectares of land northwest of High Brocklands in West Sleekburn, Northumberland. The West Sleekburn Data Centre campus would total up to 356,500 sqm (3.8 million sq ft).<\/p>\n<p data-block-key=\"cbtmr\">Planning documents suggest three buildings and two on-site substations are planned. Wansbeck Regeneration originally planned four buildings totaling 451MW, but revised plans during the pre-application process.<\/p>\n<p data-block-key=\"3j11j\">Some 90MW of natural gas-powered fuel cells are also planned, offering around 50MW of IT load capacity. The company said these cells will be a \u201cbridging solution\u201d and will be removed once the site is fully operational.<\/p>\n<p data-block-key=\"3m06g\">\u201cThe proposals represent a significant opportunity to build on the location of the site within an AI Growth Zone by providing substantial inward investment within Northumberland, and generating significant direct and indirect job opportunities within the local area,\u201d the company said in planning documents.<\/p>\n<p data-block-key=\"1nfaa\">News that a data center was being planned in West Sleekburn <a href=\"https:\/\/www.datacenterdynamics.com\/en\/news\/data-center-pitched-in-northumberland-uk\/\">surfaced earlier this year<\/a>, though few details were available at the time.<\/p>\n<p data-block-key=\"7pjvc\">The site was previously part of the wider GlaxoSmithKline (GSK) pharmaceutical manufacturing facility that operated in Cambois from 1971 until around 2004.<\/p>\n<p data-block-key=\"eil3e\">The project is around a mile north of the Cambois project from QTS. The 540,000 sqm (5,800,000 sq ft) campus will be built at the former Blyth Power Station. Up to ten data center buildings totaling 720MW could be developed at full build-out.<\/p>\n<p data-block-key=\"cttq\">Few details about Wansbeck Regeneration are available.<\/p>\n<\/div>\n<div class=\"w-block-newsletter block-newsletter\">\n<div class=\"panel panel--bordered\">\n<div class=\"js-formThankYou\">\n         Thank you for subscribing to our EMEA newsletter series.\n    <\/div>\n<\/div>\n<\/div>\n<div class=\"w-block-auto_featured_content block-auto_featured_content\">\n<div class=\"panel panel--plain\">\n<h2 class=\"panel__title\">More in Construction &amp; Site Selection<\/h2>\n<ul class=\"plain-list flex-container\">\n<li class=\"column--third\">\n<article class=\"card taxonomy channel-investment-markets\">\n<\/article>\n<\/li>\n<li class=\"column--third\">\n<article class=\"card\">\n<div class=\"card__image\">\n            <img loading=\"lazy\" decoding=\"async\" alt=\"Mark Zuckerberg\" height=\"185\" src=\"https:\/\/media.datacenterdynamics.com\/media\/images\/zuckerberg.2e16d0ba.fill-280x185_H99NJqw.jpg\" width=\"280\" \/>\n<div class=\"card__overlay\">\n            <time datetime=\"2026-06-10\">10 Jun 2026<\/time><\/div>\n<\/div>\n<\/article>\n<\/li>\n<li class=\"column--third\">\n<article class=\"card\">\n<div class=\"card__image\">\n            <img loading=\"lazy\" decoding=\"async\" alt=\"Mapping Europe\u2019s emerging data center cities\" height=\"185\" src=\"https:\/\/media.datacenterdynamics.com\/media\/images\/Mapping_Europes_emerging_data_cent.2e16d0ba.fill-280x185.png\" width=\"280\" \/><\/div>\n<\/article>\n<\/li>\n<\/ul>\n<\/div>\n<\/div>\n<div class=\"w-block-auto_featured_content block-auto_featured_content\">\n<div class=\"panel panel--plain\">\n<h2 class=\"panel__title\">More in Behind-The-Meter<\/h2>\n<ul class=\"plain-list flex-container\">\n<li class=\"column--third\">\n<article class=\"card\">\n<div class=\"card__image\">\n            <img loading=\"lazy\" decoding=\"async\" alt=\"Terrestrial Energy ISMR plant\" height=\"185\" src=\"https:\/\/media.datacenterdynamics.com\/media\/images\/Terrestrial_Energy_ISMR_plant.2e16d0ba.fill-280x185.png\" width=\"280\" \/>\n<div class=\"card__overlay\">\n            <time datetime=\"2026-05-08\">08 May 2026<\/time><\/div>\n<\/div>\n<\/article>\n<\/li>\n<li class=\"column--third\">\n<article class=\"card\">\n<div class=\"card__image\">\n            <img loading=\"lazy\" decoding=\"async\" alt=\"Dalton Highway\" height=\"185\" src=\"https:\/\/media.datacenterdynamics.com\/media\/images\/GettyImages-1492646487.2e16d0ba.fill-280x185.jpg\" width=\"280\" \/>\n<div class=\"card__overlay\">\n            <time datetime=\"2026-05-20\">20 May 2026<\/time><\/div>\n<\/div>\n<\/article>\n<\/li>\n<li class=\"column--third\">\n<article class=\"card\">\n<div class=\"card__image\">\n            <img loading=\"lazy\" decoding=\"async\" alt=\"The age of the microgrid - how to power an AI data center\" height=\"185\" src=\"https:\/\/media.datacenterdynamics.com\/media\/images\/The_age_of_the_microgrid_-_how_to_.2e16d0ba.fill-280x185.png\" width=\"280\" \/><\/div>\n<\/article>\n<\/li>\n<\/ul>\n<\/div>\n<\/div>\n<p>\u00a0<\/p>","protected":false},"excerpt":{"rendered":"<p>Plans have been filed to develop a data center in the northeast of England, close to QTS\u2019 planned development. As reported by the Northumberland&hellip;<\/p>\n","protected":false},"author":0,"featured_media":2238,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[],"class_list":["post-2237","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-data-center"],"_links":{"self":[{"href":"https:\/\/trustedainews.com\/index.php?rest_route=\/wp\/v2\/posts\/2237","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trustedainews.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/trustedainews.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/trustedainews.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/trustedainews.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2237"}],"version-history":[{"count":0,"href":"https:\/\/trustedainews.com\/index.php?rest_route=\/wp\/v2\/posts\/2237\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trustedainews.com\/index.php?rest_route=\/wp\/v2\/media\/2238"}],"wp:attachment":[{"href":"https:\/\/trustedainews.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2237"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/trustedainews.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2237"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/trustedainews.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2237"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}