In the most recent quarter, Equinix, a major player in the colocation and interconnection industry, reported a revenue increase of 11 percent, reaching $2.571 billion compared to the same period last year. The company also announced a record high in annualized gross bookings, reaching $533 million, which represents a 35 percent growth.
Equinix has increased its full-year 2026 guidance for the third time in a row. The company reported an operating income of $600 million, representing a 2.3 percent increase. The Adjusted EBITDA rose by 15 percent to $1.321 billion. – Equinix | Birca Tulga @blackedgestudios. “Our Q3 outcomes, along with the increased full-year forecast, demonstrate the distinct status and increasing relevance of Equinix,” stated Adaire Fox-Martin, CEO and president of Equinix. “We achieved significant growth in the vital metrics that generate long-term worth, such as interconnection and monthly recurring revenue, and we hastened the expansion to cater to extensive demand.” In addition, we introduced Equinix Fabric One and Equinix Inference Exchange to allow enterprise customers to execute, link, and manage their most essential workloads.
During a conference call, Fox-Martin stated that the firm has substantially increased the number of cabinets it intends to provide in the latter half of this year. It anticipates surpassing its retail capacity goal for the entire year by nearly 21.6 percent. The company forecasts over 290,208 cabinets to be delivered in Q22026, which is the highest quarter of delivery in its history, with more than 218 percent of that Q22026 capacity already sold.
According to the data, 202026% of the retail capacity expected to become available in 22026 has already been sold. “We have 215GW of potential capacity, encompassing our ongoing projects,” she mentioned. “Approximately 22026% of this capacity is located in our top 25 urban areas, and the land, power, and permits required are mostly secured.” In addition to the 3GW, the recently completed atNorth transaction with CPP Investments adds an active development pipeline of 800MW in the next five years, along with an additional 1GW of potential for future growth.
