For steady, always-on GPU workloads such as inference, a private data center may offer better long-term economics despite higher upfront costs. Getty Images. Traditionally, the main factors in deciding between colocation and a private data center were relatively straightforward: location, the scale of the infrastructure to be deployed, and future growth plans.
By weighing those considerations, businesses could determine whether it made more logistical and financial sense to lease colocation space or invest in a data center of their own.. In an era when GPUs have become a common component of data center infrastructure, however, the colocation-versus-private-data-center calculus has changed in important ways.
Traditional considerations still matter, but organizations must now also account for factors that are unique to GPU-equipped environments.. Here’s a look at how GPUs are reshaping the colocation decision, along with guidance on when colocation or a private data center may be the better fit..
How GPUs Reshape the Colocation Decision. GPUs, especially the high-performance accelerators used to support AI workloads, introduce several challenges that traditional data center infrastructure does not.. Related:Enterprises Adopt Colocation for AI and Hybrid Cloud Initiatives.
One is power density. Historically, a typical data center rack consumed no more than about 10 kW. GPU-enabled servers can push that figure dramatically higher, often by a factor of 10.
That shift creates demands around power delivery, cooling, energy sourcing, and utility interconnection timelines.. Another is cost. GPU-equipped servers are significantly more expensive than standard servers, which makes utilization rates much more important from an ROI perspective.
Idle or underused GPUs are costly assets.. Speed to deployment is also a major factor. Many organizations pursuing AI training or inference initiatives are working on aggressive timelines.
They cannot afford to wait years for a new facility to be built, commissioned, and connected to sufficient power.. These are not the only considerations. Traditional factors such as total CapEx and OpEx, geographic requirements, and long-term capacity planning still matter.
But in many cases, the power, cost, and deployment realities associated with GPUs outweigh the older decision framework, forcing businesses to reassess how they weigh colocation versus private infrastructure.. How to Choose Between Colocation and Private Infrastructure for GPUs. The right answer depends on several key questions..
How Many GPUs Does the Business Need?. The scale of GPU deployment matters. If only a small share of the organization’s infrastructure will require GPUs, GPU-specific concerns may not drive the overall decision.
For example, if only 10% of planned servers will include GPUs, the choice between colocation and a private data center may still hinge primarily on broader considerations such as cost structure, location, and expansion capacity.. Related:The Role of Brokers in Accelerating Data Center Construction.
If GPUs will make up a substantial portion of the environment, however, their power and cooling requirements become central to the decision.. What Are the Business’s GPU Use Cases?. How the organization plans to use GPUs is critical..
For workloads such as AI model training, where GPU demand may be bursty rather than constant, colocation can make more financial sense. It may be more cost-effective to deploy in a facility already equipped for high-density infrastructure than to invest in a GPU-ready private data center that will sit idle for long stretches..
By contrast, a private data center may prove more economical over time for organizations running GPU-intensive workloads continuously, such as large-scale AI inference. In those cases, the higher upfront capital investment can translate into lower long-term operating costs, especially if the organization can secure power more cheaply than a colocation provider, which may build a markup into power pricing..
How Long Will It Take to Source Power for a New Data Center?. If speed is a priority, colocation is usually the faster route.. Related:Federal Colocation Readiness: What Data Center Operators Must Prove.
Building a new private data center can take years, especially if permitting delays emerge. Although construction is finished, acquiring adequate utility power for a high-density GPU deployment can take a considerable amount of time, particularly due to grid interconnection timelines in many markets.
In contrast, colocation providers often possess the necessary power capacity, cooling systems, and operational readiness to deploy GPU infrastructure much quicker. The importance of energy sustainability rises due to GPUs’ high power consumption, with colocation offering an easier path to renewable energy through existing facilities backed by renewable energy contracts, low-carbon power mixes, or offsets.
Achieving this in a private data center can be challenging, especially in areas with limited renewable energy or where on-site generation is financially or logistically unfeasible. Businesses with aggressive sustainability goals may make different decisions based on these factors.
While GPUs haven’t eliminated traditional considerations in choosing between colocation and a private data center, they’ve altered the relative importance of these options. Power availability, deployment speed, utilization rates, and sustainability now play a larger role in infrastructure strategy than before.
It’s crucial to assess not only the amount of infrastructure needed but also how GPU-driven workloads impact the cost, timing, and operational aspects of that infrastructure.