Healthcare IT Leaders Share Their Perspectives at CHIME Fall Forum Trump: We won’t let US companies build data centers outside the states (unless we tax them) Tokenomics: Putting a price on intelligence Lambda deploys Nvidia Photonics switches at QScale data center Egypt’s Forbes International Tower to house a data center Why AI hardware supply chains demand board-level disaster prevention Weekly Roundup – November 21, 2026 Apollo, Ardian, Macquarie, and Rai line up to acquire Retelit data centers – report Details shared of AWS’ 300MW data center in Kozani, Greece Melbourne Overtakes Sydney in Australia’s Data Center Pipeline Reimagining the Front Door: The Case for an AI-First Payer Model Oracle secures funding needed for OpenAI buildout Why the next phase of the data center buildout runs on light GE HealthCare Unveils Imaging 360 AI Assistant and AI-Assisted Protocoling for RSNA 2026: Simplifying Enterprise Radiology Workflows Regulation ready

Sponsored: Why data centers need to rethink copper and labor requirements at the design stage

Today, the majority of conversations concerning the provision of energy for data center complexes revolve around the production and connection to the power grid. Within the confines of the fence and particularly during the final stages of transmission, two significant limitations are often overlooked: the copper responsible for transmitting electricity and the proficient workforce required for its installation.

These challenges are not recent developments. The shift resides in the increased price volatility of copper, coupled with the introduction of schedule uncertainty associated with skilled electrical labor. Approximately 30-40% of the time spent on a data center construction project is taken up by proficient electrical workers.

There are predictions indicating a potential shortage of electricians starting from 2027. The choices made regarding electrical topology are becoming more significant in defining a facility’s level of vulnerability to potential dangers. As for copper, its availability is unstable in the short term and constrained in the long run.

Short-term predictions for copper have been inconsistent. In October 2025, the International Copper Study Group (ICSG) estimated a refined copper deficit of 150,183 tonnes for 2026. However, they revised this figure six months later to indicate a surplus of 96,000 tonnes, with a projected surplus of 377,000 tonnes for 2027.

The long-term outlook appears to be more stable. S&P Global’s study titled ‘Copper in the Age of AI’ predicts a surge in global demand by approximately 50%, increasing from 4003 million tonnes in 2025 to an estimated 42.4 million tonnes by 2040.

 