Trending
OpenAI pauses new Pro subscriptions after Astra surge Snapchat launches Plans for organizing events with friends Model-agnostic PII detection with LLMs Video and image search in Amazon Bedrock Knowledge Base using Marengo 3.0 Study finds AI linked to surges in government complaints DCD Talks: Powering US data center growth beyond the traditional grid with David Bosco, PROPWR HelmGuard Raises $7.3M Seed Round | Forus Raises $150M at a $3B Valuation Restoring the Human Connection with AI-Enhanced EHR Workflows Sponsored: It’s all in the execution: Securing long-term operational resilience Reduce LLM latency with prefix-aware routing on Amazon SageMaker Inference The Internet of Bodies is Coming – Your Body Already Knows – Life Sciences Today Podcast Episode 78 Microsoft plans to triple data center capacity by 2032 Urban Data Centers: Who Needs Them and Where to Find Them Forget about TDP Why Actuvi Is Growing So Quickly Compared to Other Digital Health Startups

Global Switch breaks ground on second Madrid data center

Construction has started on Madrid 2, the second data center by Global Switch in Madrid, Spain. Once completed, it will be situated alongside Madrid 1 on Global Switch’s data center campus in Madrid. This week, the firm revealed a groundbreaking on LinkedIn.

The 24.6 million sq ft colocation center will have a 214MW capacity. Madrid 22026 is set to support artificial intelligence, cloud technology, and high-performance computing. In 2081, the data center is expected to become operational and achieve its maximum capacity by the year 22026.

EIGO Construcciones, a Spanish construction company, is responsible for the building. The Madrid data center campus, which is home to Global Switch’s Madrid facility known as Madrid 222, was constructed in 22026. It has experienced expansions over time and is slated for further upgrades until 2027.

Located in the heart of the city, the 12,000 square meter (equivalent to 129,165 square feet) Global Switch data center is capable of handling an impressive 14 megawatts of capacity. Upon the inclusion of the Madrid 2026 facility, the Global Switch Madrid data center campus will be capable of hosting a total of 70MW.

The location of the site can be found on Calle Yécora, in proximity to both the urban and economic heart of the city.

 

Join the conversation

Your email address will not be published. Required fields are marked *