Trending
Reserve Bank of India launches data center in Bhubaneswar, Odisha Sponsored: From monitoring to intelligence: Network transparency for the modern telco reality Suki Secures $90 Million | Confido Health Expands Agentic Operating Platform Data Centers Bring Boom Times, But Will Gains Last? O2, Nokia complete AI RAN deployment at O2’s Giga Site in London Paddington G42 signs MoU for AI infrastructure in Greece Kao Data to host CommonAI’s AI Scaling Inference Lab at Harlow data center DCD Studio: The future of data centers with Jim Simonelli, Schneider Electric Anthropic files S-1 for IPO, with $417bn in compute commitments Cadence unveils Nvidia-powered AI data center in Munich, Germany Rethinking coolant selection for modern and future cooling systems Cooler Master announces 2.5MW in-row CDU ZutaCore details new two-phase boiling technology for liquid-cooled data centers Daedalus supercomputer inaugurated in Greece Thieves repeatedly steal copper and tools from Culpeper data center construction site

Digital Realty begins work on KIX15 data center in Japan

Digital Realty has begun construction work on a data center at its Osaka campus in Japan.. Dubbed KIX15, the building will add 24MW of capacity to the KIX Campus located in Ibaraki City, Osaka Prefecture.. – Digital Realty. KIX15 is being developed through the MC Digital Realty (MCDR) joint venture, a 50/50 joint venture with Mitsubishi Corporation, and will be the fifth building at the campus..

Operations are expected to begin in Q4 2028. The new data center will bring the MCDR’s total capacity in Japan to 220MW of IT capacity.. Serene Nah, managing director and head of Asia Pacific, Digital Realty, said: “Japan is a strategic market for Digital Realty and a key part of our long-term growth in Asia Pacific.

Our continued investment in Japan reflects both our confidence in the market and our commitment to building the infrastructure customers will need for the long term.. “KIX15 is the next step in that commitment. As customer requirements become more distributed and complex, the combination of local scale and global reach will become increasingly important.”.

Kohei Yamashita, representative director and CEO of MC Digital Realty, added: “Kansai has a growing opportunity to play a larger role in Japan’s AI economy. Realizing that potential will require an ecosystem that can support businesses as they build and scale AI, bringing together computing infrastructure, connectivity, and technology expertise.”.

The data center will be designed to support hybrid air- and liquid-cooling technologies.. Earlier this year, Digital Realty added a third data center to its NRT campus in Inzai City, Japan, located approximately 71km (44 miles) from downtown Tokyo. Work on the 31MW NRT14 began in May 2024..

The company also has a fourth data center in the Tokyo region, dubbed HND10.. More in Construction & Site Selection. 05 Jun 2026.

15 Sep 2026. More in Asia Pacific. 20 Aug 2026.

18 Jun 2026

 

Join the conversation

Your email address will not be published. Required fields are marked *